Three Ways a Warning Letter Starts: What the Intervals Say to a Slimming Patch OEM in 2026
Three Ways a Warning Letter Starts: What the Intervals Say to a Slimming Patch OEM in 2026

A warning letter looks like an event with a date. It is not. It is the end of a process, and the process has at least three different shapes, and each shape has its own clock.
This library has eleven cases with enough recorded detail to place a letter on a timeline. Seven of them started with an inspector on site. Three started with somebody reviewing a website or a product bought from a shelf. One started with a request for records.
The intervals are not similar, and the differences are not random. The seven inspection cases run from 139 to 197 days and cluster in a band 58 days wide. The review cases run from about two and a half months to about eleven, depending on which review it was.
For a slimming patch OEM the point is not the numbers themselves. The point is that one of the three routes costs the agency almost nothing to start, and that route can be started by anyone with a credit card.
1. The dataset, and what it can carry
Eleven cases, all recorded in this library, all with a documented start date.
| The case | The route | The start | The letter | The interval |
|---|---|---|---|---|
| 704166 | Site inspection | End of the inspection | 2025-05-29 | 139 days |
| 722589 | Site inspection | End of the inspection | 2026-04-14 | 159 days |
| 724506 | Site inspection | End of the inspection | 2026-05-29 | 163 days |
| 320-26-12 | Site inspection | End of the inspection | 2025-10-31 | 175 days |
| 721916 | Site inspection | End of the inspection | 2026-04-09 | 175 days |
| 320-26-105 | Site inspection | End of the inspection | 2026-07-24 | 189 days |
| 320-26-99 | Site inspection | End of the inspection | 2026-07-02 | 195 days |
| 726976 | Site inspection | End of the inspection | 2026-07-31 | 197 days |
| 735346 | Website and storefront review | July 2026 | 2026-10-01 | About 2.5 to 3 months |
| 736006 | Product purchased from a platform | July 2026 | 2026-10-01 | About 2.5 to 3 months |
| 736557 | Product purchased from a platform | July 2026 | 2026-10-01 | About 2.5 to 3 months |
| 718720 | Label review | 2025-04-15 | 2025-11-12 | 211 days |
| 707956 | Records and information request | 2024-09-04 | 2025-08-11 | About 11 months |
The table is thirteen rows and there are three routes in it, and the routes are defined by what the agency had to do first.
A slimming patch OEM reading this table should note the two inspection cases that share 175 days and the three review cases that share one date, because those are the two shapes the data has.

2. Route one: the inspection, and how tight its window is
Seven cases, and the spread is 58 days across a range of 139 to 197. That is a tight band for an administrative process.
| The measure | The value | What it means |
|---|---|---|
| The number of cases | Seven, all with a recorded end-of-inspection date | The sample is small and the band is narrow |
| The shortest interval | 139 days, in the case of 704166 | The agency moved from the end of the visit to a letter in under five months |
| The median | 175 days | Two cases sit on that value, 320-26-12 and 721916 |
| The longest | 197 days, in the case of 726976 | Still under seven months |
| The spread | 58 days between the shortest and the longest | Half the range of a single year, across seven separate cases |
The fifth row is the one that carries the interpretation. Seven independent cases, seven separate inspections, seven separate firms, and every one of them received a letter within a band 58 days wide.
A band that tight is not a coincidence. It is the signature of a process with a fixed internal clock, and it means the inspection route is the one route where a buyer can reason about how long the letter takes.
For a slimming patch OEM the useful form of that is a planning assumption: if an inspection has happened, the letter is likely to arrive within roughly five to seven months.

3. Route two: the review that costs almost nothing to start
Three cases, one start date, one letter date, and a completely different trigger.
In the Amazon and the Walmart cases the agency bought the products from the two websites in July 2026 and reviewed their labelling. In the Aidance case the agency reviewed the company website and its Amazon storefront in the same month. All three letters were issued on 1 October 2026.
| What the agency did | What it cost | What it reached |
|---|---|---|
| Bought products from a platform listing | The price of the products and the shipping | The label as the customer would receive it |
| Reviewed a company website and a storefront | An hour of browsing | The claims as they are published to the public |
| Reviewed a product label | One document | The intended use as the label states it |
The first column is the point of this route. Every one of those actions is cheap, repeatable and available to anyone, which is why this route is the one a buyer cannot schedule away.
The second column is why the result is closer to a label than to a plant. A bought product carries the label and nothing else, so the route can find a claim problem and cannot find a process problem.
A slimming patch OEM whose label makes a claim the route does not permit can be found this way, and a slimming patch OEM whose plant has a process problem cannot.

4. Route three: the records request
One case, and it is the slowest route in the set by a wide margin.
In the case of 707956 the agency issued a records and information request on 4 September 2024 under section 704(a)(4) of the Federal Food, Drug, and Cosmetic Act, and the warning letter followed on 11 August 2025, about eleven months later.
| The feature of this route | Why it behaves the way it does |
|---|---|
| The agency asks for records rather than going to look | The clock starts when the request is answered, not when it is sent |
| The firm controls the pace of the response | Eleven months includes however long the firm took to respond |
| The letter can reach backwards | A records request can cover periods long before the request itself |
| The route reaches what an inspection cannot | It can open a file that a two-day or seven-day site visit would not |
The second row is the one that changes how a firm should treat a letter from this route. The elapsed time is not entirely the agency pace, and a firm that believes the delay is out of its hands has not read the record.
A slimming patch OEM that receives a records request and does not treat the response date as a control point is treating the eleven-month clock as fixed, and the record does not say that it is.

5. The one cluster in the set: three letters on one day
The most useful thing in this dataset is not an interval. It is the single date on which three letters were issued.
| The letter | The party | The route | The start |
|---|---|---|---|
| 735346 | The manufacturer | Website and storefront review | July 2026 |
| 736006 | The platform | Product purchased from the platform | July 2026 |
| 736557 | The second platform | Product purchased from the platform | July 2026 |
All three were issued on 1 October 2026, and all three started in July 2026, and the products overlap. Herstat GST and Terragen HG Formula each appear in a manufacturer letter and in both platform letters, and HClear for him appears in both platform letters.
That is one enforcement action working along a product chain, and it is the first time this library has been able to see a single action laid across a manufacturer and two platforms at once.
The consequence for a buyer is precise. The risk did not arrive three times. It arrived once, in July 2026, and it was applied three times in October.
A slimming patch OEM that audits only its own factory has audited one third of what was examined in that single action.

6. The route that follows a funnel, not a chain
One case in the set did not start with a purchase or an inspection. It started with the agency reading three channels.
In the case of 718720 to Sinsin Pharmaceutical, the agency reviewed the official website, Facebook and Instagram, and all three channels led to the same Amazon storefront. It is the first case in this library in which three communication channels were reviewed in the same action.
| The channel | What it can reveal | Why it matters for a buyer |
|---|---|---|
| The official website | The claims the company makes in its own voice | A claim made on a site is a claim made to the public |
| A social media account | The claims the company makes in a promotional voice | Marketing copy is usually written faster and looser than a label |
| A marketplace storefront | The listing, the images and the price | This is where a company that does not own a shop still reaches the customer |
The second row is the one to watch. A promotional post is not a regulated document, and the language in one is often the language that a label review would object to.
A slimming patch OEM that reviews its own label but not its own social accounts is reviewing the document the agency looks at last rather than the one it looks at first.

7. The last clock: between the letter and the public record
Everything above is measured to the date on the letter. The public record comes later, and the delay is measurable.
From a sample of 100 consecutive entries published between 29 September and 10 November 2026, the median gap between the date on the letter and the date of publication was 14 days, 70 percent were within 8 days, and the longest was 239 days. In that sample CDER accounted for 50 percent of the entries and CDRH for 7 percent.
| The measure | The value | The qualification |
|---|---|---|
| The sample | 100 consecutive entries | Published between 2026-09-29 and 2026-11-10, not a full year |
| The median gap | 14 days | Between the date on the letter and the date of publication |
| The concentration | 70 percent within 8 days | A tight cluster near the start |
| The longest gap | 239 days | The tail exists and it is long |
| The office split | CDER 50 percent, CDRH 7 percent | Within this sample only |
The third row is the one a reader should not skip. Seventy percent of the entries appeared within eight days of the letter, and one in the sample took 239 days to appear.
For a slimming patch OEM the practical effect is that a public search of the warning letter record is a lagging indicator, and a clean search result on a given day does not mean that no letter exists.

8. What this dataset settles and what it does not
The boundaries matter, because the sample is small and the routes are few.
| It settles | It does not settle |
|---|---|
| There are three routes to a letter in this set | That these are the only three routes the agency uses |
| The inspection route has a tight interval band | That every inspection produces a letter on that schedule |
| One action can reach a manufacturer and two platforms at once | That every action has that reach |
| The publication lag on top of the letter is short for most entries | That a short lag means a letter is easy to find |
| The review route reaches labels and claims | That it can reach a plant or a process |
The second row of the first column is the one that needs the most care. Seven cases with an interval band of 58 days is a strong pattern, and it is still seven cases.
A slimming patch OEM that treats this dataset as a screening tool has used it correctly, and a slimming patch OEM that treats it as a schedule has mistaken a tendency for a rule.

9. What to do with the three routes
Three actions, one per route, and the order of effort is not the order of likelihood.
| The route | The action | Why it comes first |
|---|---|---|
| The review route | Review the label, the product page and the social accounts as one set of claims, and check them against the route the product is sold on | It is the cheapest to trigger and the one a buyer cannot schedule |
| The inspection route | Assume the letter arrives five to seven months after an inspection, and have the response materials ready before then | The band is tight and predictable, so preparation is what pays |
| The records request route | Answer inside a deadline that is set by the business, not by the agency | The eleven months in the one recorded case includes the response time |
The first row is the one that changes routine. A label review, a product page and a social post are three versions of the same claim, and the agency treated them as one case.
The third row is the one that is usually missed. A firm that responds quickly has a shorter case, and a slimming patch OEM that treats the response as the agency problem has misread which clock is running.
A slimming patch OEM that handles the first row and the third row has covered the two routes it can control, and a slimming patch OEM that only prepares for the inspection has prepared for the route it cannot start.
10. The three routes give the buyer three different moments of knowing
The intervals are the visible part. The part that matters more for a buyer is when each route becomes visible to you.
| The route | When the buyer first knows | How much warning that gives |
|---|---|---|
| Site inspection | Usually on the day, because the buyer is often there or is told the visit is happening | Five to seven months before the letter, which is the only route with real lead time |
| Review of a website, a storefront or a label | Usually not until the letter is public, because the action is carried out by the agency alone | None at all, and the public record lags the letter by a median of 14 days |
| Records and information request | When the firm is contacted, if the firm says so | Whatever the response takes, and it is the only route with a clock the business partly controls |
The first row is the only one in which the buyer has any control over the timing, and it is the only one in which the buyer is normally present when the process starts.
The second row is the one that is easy to get wrong. A buyer who assumes that a website review is something they will be told about is assuming an inspection they did not attend, and the slimming patch OEM who wants to be warned has to build the warning themselves, because the agency does not build it.
The third row is the row that gives a slimming patch OEM something it can act on, and it is the row that most firms lose, because a records request is treated as a legal matter to be handled by a lawyer rather than as a date in a supply plan.
Put together, the three rows give a slimming patch OEM a clear order of work: the inspection is where preparation pays, the review is where self-audit pays, and the records request is where speed pays.
About KONGDY Medical


Henan Kongdy Medical Devices Co., LTD. (KONGDY) was founded in 1989 and has 37 years of production experience as of 2026 across pain relief patches, slimming patches, capsicum plasters, heat patches, cooling gel patches, detox foot patches, steam eye masks, mosquito repellent patches and nose strips. Headquartered in Henan, China, KONGDY operates a 100,000-class GMP workshop built in 2008 and obtained ISO 13485 medical device Quality Management System European Standard Certification in 2014. The company runs OEM and ODM services for international brands across multiple regulatory pathways.
For a 2026 procurement evaluation the qualification team can supply the ISO 13485 certificate, GMP workshop audit reports, stability programme documentation, and reference customer case studies upon request via our contact page.
Frequently asked questions
What are the three routes by which a warning letter starts?
A site inspection, a review of a website, a storefront or a product label, and a formal records and information request under section 704(a)(4) of the FD&C Act. All three appear in this library with a recorded start date.
How tight is the interval between an inspection and a letter?
Across seven recorded inspection cases the interval from the end of the inspection to the letter runs from 139 days to 197 days, with a median of 175 days and a spread of 58 days. Seven independent firms and seven inspections produced a band that narrow.
What were the three letters issued on 1 October 2026?
Warning letter 735346 to Aidance Scientific, Inc., 736006 to Amazon.com, Inc. and 736557 to Walmart, Inc. The first reached the manufacturer through a website and storefront review and the other two through products purchased from the platforms, all three starting in July 2026, and the products overlap between them.
Why does the Aidance letter matter for a product page?
Because it is the first case in this library where the agency reviewed three channels in one action, the official website, Facebook and Instagram, all of which led to the same Amazon storefront. Marketing copy and label copy are reviewed as one set of claims.
How long does the records request route take?
In the one recorded case, 707956, the agency issued a records and information request on 2024-09-04 under section 704(a)(4) and the letter followed on 2025-08-11, about eleven months. That interval includes the time the firm took to respond, which makes the response date a control point rather than a fixed part of the route.
What does the review route reach that an inspection cannot?
The label and the claims, as the customer would receive them. The review route in these cases reached claims that were not permitted on the label, and it could not have found a process or plant problem, because nothing in the action involved the plant.
How long between the letter and the public record?
In a sample of 100 consecutive entries published between 2026-09-29 and 2026-11-10, the median was 14 days, 70 percent were within 8 days and the longest was 239 days. This is a sample from a two-month publication window and not a full-year distribution.
Does a clean warning letter search mean there is no letter?
Not necessarily. A letter can exist and not yet be public, and in the sample above one entry took 239 days to appear. A search is a lagging indicator and a clean result is not evidence of absence.
What should a buyer do with this?
Three actions. Review the label, the product page and the social accounts as one set of claims. Assume a letter arrives five to seven months after an inspection and have the response materials ready. And treat the response deadline on a records request as a business date rather than an agency date.
Related Guides
Five further references from the KONGDY knowledge base:
- Slimming Patch OEM: nine stages of an FDA site inspection
- Pain Relief Patch OEM: what an FDA site inspection looks like
- Capsicum Plaster OEM: twelve questions to ask before you sign
- Frequently asked compliance questions
- KONGDY OEM and ODM manufacturing services